Project Salient Features
Project Name Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Chainage 33+604 to 63+117) under Inter Corridor Route under BharatmalaPariyojana on Hybrid Annuity mode in the state of Telangana. (Package-II)
Total Bid Project Cost: 637.11 Cr. (Incl GST)
Pavement Type: Flexible
No of Lanes: 4
Right of Way: 60 Meter
Date of LOA: 15th September 2021
Date of Agreement: 25th February 2022
Date of Appointment: 31st October 2022
Date of Appointment: 13th September 2022
Date of Completion: 12th October 2024
Client: National Highways Authority of India (NHAI)
Completion Period: 24 months from date of Appointment
Client: National Highways Authority of India (NHAI)
EPC Contractor: H.G.INFRA ENGINEERING LTD.
Independent Engineer: LEA Associates South Asia Pvt. Ltd
Project Model Type: Hybrid Annuity Mode (HAM)
Maintenance Period: 15 Years
Project Features
Project Scope: Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Chainage 33+604 to 63+117) under Inter Corridor Route under BharatmalaPariyojana on Hybrid Annuity mode in the state of Telangana. (Package-II)
Length of the Project 29.513 Kms
Major Bridges 3
Minor Bridges 10
ROB -
Underpasses 29
Interchange/Flyover 1
Culverts 50
Major/Minor Junctions 1